Responsive Image Banner

Canadian government pledges CAN$3.9bn for country’s first high-speed railway

Canada’s Prime Minister Justin Trudeau has pledged CAN$3.9 billion (US$2.8 billion) over six years to develop the country’s first high-speed railway, running 1,000km (621 miles) from Toronto to Quebec City.

Logo of Alto, Canada's high-speed railway, on the side of a train. Image: Alto

The Cadence consortium, consisting of AtkinsRéalis, Air Canada, CDPQ Infra, Keolis, Systra, and SNCF Voyageurs, will co-design, build, finance, operate and maintain the project.

Cadence will collaborate with and support the Toronto–Quebec City High-Speed ​​Rail Network (known as Alto), as work starts on detailed design, indigenous consultations, land acquisitions and environmental assessments.

Cadence and Alto are expected to sign a contract setting out the terms of the next phase of the project shortly.

Trudeau’s office claimed that the railway would boost Canada’s GDP by up to $35 billion, with the line serving an area that is home to 18 million people and accounts for 40% of the country’s GDP.

Trains will run at speeds of up to 300km/h (186.4 mph) and stop at Toronto, Peterborough, Ottawa, Montréal, Laval, Trois-Rivières, and Quebec City.

Canadian passenger rail services currently run on tracks owned by freight railways, which limits the frequency of the service they offer and leads to delays, according to Trudeau’s office.

Trudeau said, “Canada is getting high-speed rail. Today’s announcement of Alto, a high-speed rail system between Toronto and Quebec City, will transform our economy – drastically shortening commute times for millions of Canadians, turbocharging economic growth, creating thousands of good-paying jobs, improving productivity, and reducing emissions.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time