Responsive Image Banner

Webuild working on ‘largest sustainable project of its kind’

Premium Content

Webuild has completed filling with water a sub-fluvial tunnel near Buenos Aires, Argentina – the tunnel is 10km in length and will help to clean Argentina’s Matanza-Riachuelo River Basin, one of the most polluted in the world.

The accompanying plant will treat up to 2.3 million cubic metres of water a day, improving lives of four million residents. The project is part of Lot 3 of the Riachuelo Environmental Restoration Project, a sustainable development initiative financed by the World Bank. 

At a length of 10.5m and a depth of 40m below the bed of the River Plate, the 4.3m diametre tunnel will receive wastewater from the basin that has been treated at a new plant and diffuse it into the river at an average rate of 27 cubic metres per second.

The innovative part of the tunnel is the series of 34 steel tubes (called risers) each at a diameter of a little less than one metre installed along the ceiling of the tunnel. The treated wastewater passes through the risers that reach up to the bed of the river.

Known as Lot 2 of the project, the plant and accompanying pumping stations are being built by Webuild’s subsidiary, Fisia Italimpianti, and partner Acciona with a 35% stake. The plant will be one of the biggest of its kind in the world.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
Inside Saudi Arabia’s construction surge: three key takeaways
From Diriyah to Qiddiya, Saudi Arabia is building on an unmatched scale as Vision 2030 reshapes the kingdom’s skyline
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey