Responsive Image Banner

Webuild subsidiary wins Saudi Arabia water treatment plant contracts worth $439 million

Premium Content

Aerial view of the Shuaibah III Expansion II desalination plant in Saudi Arabia Fisia Italimpianti completed the Shuaibah III Expansion II desalination plant in Saudi Arabia in 2019 (Image: Fisia Italimpianti)

Fisia Italimpianti, a subsidiary of the Webuild Group, has won two contracts worth a combined €408 million ($439 million) to build a water treatment plant for the ZULUF onshore oil facilities in Saudi Arabia.

The contracts mark Fisia Italimpianti’s entry into the oil and gas industry and its return to the operation and maintenance segment of the water sector.

The first deal is an engineering, procurement and construction (EPC) contract, worth $327 million, includes the construction of a plant for the ZULUF Central Processing Facilities that is required for the onshore structures.

The construction is part of the Arab Heavy (AH) Crude Oil Increment of the ZULUF field development programme by oil giant Aramco. Located in eastern Saudi Arabia approximately 6 kilometres west of the airport in Tanajib, it will be built for a consortium comprised of Almar Water Solutions and Aljomaih Energy and Water Co Ltd. on behalf of Aramco.

Fisia Italimpianti will build the plant that will treat, degas and filter water for iron and suspended solids at a maximum production capacity of 185,000 cubic metres per day. The plant will reinject the water in the oil wells to facilitate the production of Arab Heavy crude oil by maintaining pressure in the wells. The project is expected to take three years to complete.

The second contract worth $112 million - in which Fisia Italimpianti owns a 20% share in a joint-venture with Almar Water Solutions, Aljomaih Energy and Water Co Ltd and Aquatech International – involves the operation and maintenance of the completed plant for 25 years.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
Why is LiuGong Access betting on new telehandler range for growth?
Telehandlers have never truly taken hold in China - at least, not yet.
Inside Trimble: How the Caterpillar relationship is shaping grade control
After 23 years of collaboration, Trimble’s Chris Shephard explains how the Caterpillar joint venture is evolving to boost flexibility and innovation in grade control technology
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA