Responsive Image Banner

£1.1bn development of London’s British Library confirmed

Japan-based developer Mitsui Fudosan has confirmed the development of the British Library extension in London, UK.

British Library design Development is to begin in 2026 (Photo: British Library)

The total investment for the project is estimated to be around £1.1 billion (US$1.4 billion), with property developer Stanhope Plc serving as the development manager.

Designed by architects RSHP and engineers Arup, the project is set to be completed by 2032.

The proposals received approval from Camden Council in July 2024 and will create approximately 100,000 square feet (9,290 square metres) of new library spaces dedicated to culture, learning, research, and business, including expanded galleries and facilities to support businesses. 

Additionally, significant areas for circulation will connect the new extension to the existing library, featuring a full-height foyer and new public entrances. Alongside the new library spaces, the project will also incorporate around 600,000 square feet (55,800 square metres) of commercial space.

Under the terms of the agreement, the British Library will grant a long lease of the land to SMBL (the Library’s Development Partner) with Stanhope retained as the development manager for the scheme.

Takeshi Iwama, chief executive of Mitsui Fudosan UK, said, “We are proud to be investing in the expansion of one of the UK’s most important cultural institutions, as well as continuing to work with community organisations in Camden to ensure that the benefits from this high-profile investment are experienced as much at the local level as they are nationally and internationally.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
Why is LiuGong Access betting on new telehandler range for growth?
Telehandlers have never truly taken hold in China - at least, not yet.
Inside Trimble: How the Caterpillar relationship is shaping grade control
After 23 years of collaboration, Trimble’s Chris Shephard explains how the Caterpillar joint venture is evolving to boost flexibility and innovation in grade control technology
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA