Video - 2012 Aquatic Centre

06 April 2010

New video from the London 2012 Olympic Delivery Authority (ODA) shows construction and the testing of the Zaha Hadid-designed Aquatics Centre dive pool and two 50 m swimming pools. The three concrete pools are being tested with over 10 million litres of water before being sealed and lined with 180000 tiles. Testing of the dive pool and training pool is complete and the competition pool starts being filled this week.
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA