Responsive Image Banner

Tunnel to replace Alaskan Way Viaduct, Seattle, US

Premium Content

20 January 2009

The central waterfront portion of the Alaskan Way Viaduct and Seawall is to be replaced with a US$ 1.9 billion tunnel. The 1.7 mile-long (2.74 km) bored tunnel - expected to be a stacked tube with two lanes in each direction, will cost just under US$ 2 billion. The total cost of the project is US$ 4.24 billion. This includes the entire viaduct corridor - over 2 miles (3.22 km), a surface street, a new seawall in the central waterfront, utility relocation, city streets and transit pathways, transit infrastructure, construction transit service and all prior program expenditures Video: Washington State Department of Transport (WSDOT)
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now