Responsive Image Banner

Lifting London 2012's bridges

Premium Content

07 October 2009

The huge land bridge that forms the main London 2012 Olympics’ “Gateway to the Games” is now taking shape. The 250 m-long, 40 m-wide bridge, which is fabricated using 1700 tonnes of steel, will form the roof of the Aquatics Centre training pool and be the main pedestrian access into the Olympic Park. It will carry an estimated 200000 people every day during the Games. Construction work is now underway on 21 of 30 new bridges that will cross waterways, roads and rivers to create a “connected, open and accessible” Olympic Park.
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now