Leighton Contractors Ipswich Motorway Project - Wacol to Darra

14 December 2009

The SAFElink Alliance - Leighton Contractors, Main Roads, BMD Constructions, Arup and Maunsell Australia - was awarded the AUS 678 million (US$ million) design and construct contract for the Ipswich Motorway Upgrade - Wacol to Darra by Queensland’s Department of Main Roads. The work included widening the Ipswich Motorway from four to six lanes, widening the Centenary Highway interchange to a multi level system interchange, construction of new bridges over Bullockhead and Sandy Creeks and the Ipswich rail line at Centenary Highway, removal of motorway access and exit points at Campbell Avenue and Akenside Street at Wacol, and Bullockhead Street at Sumner, provision of new pedestrian and cyclist paths and constructing earthworks and bridge works for Darra to Springfield rail line passing through the Centenary Highway interchange. The project started in January 2007 and was completed in December 2009.
STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA