Infinity Bridge, UK
03 December 2008
Lobster Pictures produced this video showing construction of the Infinity Bridge, Stockton-on-Tees, UK by Balfour Beatty earlier this year. One of the most spectacular parts included lifting the 170 tonne, 120 m-long main arch that took four hours and used a 280 tonne capacity Liebherr LR 1280 crawler crane, which was supplied by Dutch heavy lifting specialist Sarens.
STAY CONNECTED
Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.
CONNECT WITH THE TEAM
Neil Gerrard
Senior Editor, Editorial, UK - Wadhurst
Tel: +44 (0) 7355 092 771
E-mail: [email protected]
Catrin Jones
Deputy Editor, Editorial, UK – Wadhurst
Tel: +44 (0) 791 2298 133
E-mail: [email protected]