Infinity Bridge, UK

03 December 2008

Lobster Pictures produced this video showing construction of the Infinity Bridge, Stockton-on-Tees, UK by Balfour Beatty earlier this year. One of the most spectacular parts included lifting the 170 tonne, 120 m-long main arch that took four hours and used a 280 tonne capacity Liebherr LR 1280 crawler crane, which was supplied by Dutch heavy lifting specialist Sarens.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA