All rotterdam Articles
Hydrogen genset used to charge Hitachi electric excavator
Premium Content
What happened when construction teams were forced to abandon the planned immersion of a 185-meter-long tunnel section under one of the busiest shipping lanes in the world?
Premium Content
Vinci subsidiary wins design and build contract for LNG tank in Rotterdam
Premium Content
Where do equipment and engine manufacturers stand on alternative power sources and which do they see standing out on the road to net zero?
Premium Content
Danfoss Editron collaborates to introduce the first fully electric large foundation rig
Premium Content
Grid operator Gasunie initiates 1,200km pipeline set to cost €1.5 billion
Premium Content
Vinci Construction Grands Projets has won a €160 million contract to design and build a 180,000 m3 liquefied natural gas (LNG) tank in the Netherlands.
Premium Content
Yokogawa Electric Corporation chosen to optimise operations at the plant
Premium Content
KHL writer Lucy Barnard analyses the use of materials passports in construction
Premium Content
Part of Rotterdam’s De Hef Bridge to be dismantled to allow Amazon boss’ €430m vessel to pass
Premium Content
Ballast Nedam, Van Oord and Hochtief to build 2km of new quays at Port of Rotterdam
Premium Content
Technology can now blur the lines between the real and the programmed – and the construction industry is starting to make good use of it