Responsive Image Banner

$562m Singapore Cross Island Line extension station construction deal awarded

Premium Content

Chip Eng Seng Corporation has won a S$562 million (US$428 million) civils contractor for the construction of Elias station and tunnels under the Cross Island Line-Punggol (CPe) metro extension in Singapore. 

Artist's impression of the Cross-Island Punggol Extension Elias station Artist’s impression of the Cross-Island Punggol Extension Elias station (Image: Land Transport Authority, Singapore)

A joint venture between two subsidiaries of Chip Eng Seng Corporation – Chip Eng Seng Contractors (1988) and CES_PDC – will start work on the CPe Elias station in the second quarter of 2023.

CPe Elias is an underground station located along Pasir Drive 3. It will sit at a depth of 40m and have five entrances.

The station is part of the wider US$30 billion Cross Island Line, which will be Singapore’s eighth MRT line. The 50km line will be Singapore’s longest underground metro line.

It will serve existing and future developments in the eastern, north-eastern and western corridors, linking major hubs such as Jurong Lake District, Punggol Digital District and Changi region.

CRL Phase 1 is 29km long, and comprises 12 stations from Aviation Park to Bright Hill. Construction works have commenced and are expected to complete by 2030.

CRL Phase 2, announced in September 2022, is approximately 15 kilometres long and comprises six underground stations - Turf City, King Albert Park, Maju, Clementi, West Coast and Jurong Lake District.

Meanwhile, the 7.3km-long CPe will comprise four stations – Punggol, Riviera, Elias and Pasir Ris. It will connect eastern areas like Pasir Ris and Tampines North with north-eastern areas like Punggol and Senkang. Passenger services are due to start in 2032.

A tunnel boring machine will be used to construct a pair of tunnels, each approximately 1.4km long, linking Elias and Pasir Ris stations, with the deepest section approximately 50m below ground level.

Engineering studies for the CRL Phase 3 are ongoing and more details will be announced after these studies are completed.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
Rethinking construction’s most overlooked role: the superintendent
With labour shortages worsening, it’s time the industry modernised how it presents one of its most vital jobs – the on-site leader who keeps projects moving
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
World Construction Week newsletter

World Construction Week & Construction Briefing

Global project news, expert analysis and market trends, straight to your inbox.

Sign me up