Responsive Image Banner

Work starts on UK site for Jaguar Land Rover

Premium Content

07 January 2020

Prologis-Park-Birmingham-Interchange

Impression of the IAC facility at Solihull’s Prologis Park Birmingham Interchange

Work is now underway on a vast logistics operations centre in Solihull, UK, which will supply parts for the Jaguar Land Rover group (JLR).

Planning permission was granted in 2017, for the 91,800m2 facility, which will be leased as part of an 11-year deal to JLR’s supplier Automotive Components Group (IAC).

IAC will use the facility for manufacturing, assembly and sequencing, and to house departments including engineering, finance and IT. The company currently supplies both components and interior trim for Land Rover and Ranger Rover models, built at the nearby Lode Lane plant.

It is reported that warehouses on the site will cover an area equivalent to 13 football pitches, when the project is completed in 2021.

JLR has said that the new facility is “critical to the long-term future of our UK manufacturing operations” and insists the centre will improve efficiency and ultimately improve road conditions for residents.

In a recent company bulletin, the company said, “[The project] delivers a range of operational and environmental benefits, including one million less HGV miles on Midlands roads, equating to a reduction of 1,300 tonnes of CO2 every year.”

IAC says the project will create 400 new local jobs, as well as endorsing the West Midlands region as an important location for the automotive sector.

Manfred Gingl, IAC Group’s CEO, said, “We are a customer-centric company, which is why it was an easy decision for us to expand our operations near our customer’s production sites. IAC views the UK as a strategic market, and we look forward to continuing our partnership with JLR long into the future.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now