US reservoir contract for Lane

26 March 2019

Lane, a subsidiary of the Salini Impregilo Group, has won a US$524 million contract to build the Caloosahatchee (C43) West Basin Storage Reservoir in southern Florida, US.

river

The Caloosahatchee river in Florida, US

Commissioned by the South Florida Water Management District as part of the Comprehensive Everglades Restoration Plan, the contract is to reduce harmful discharges into the Caloosahatchee Estuary in Hendry County by 2024.

It includes the construction of an earth-fill dam with a perimeter of about 26km and a separator dam of 4.5km in length. The reservoir will encompass about 40.5km² and store 209.7 million m³ of water when full.

According to the company, when it rains the reservoir will capture water run-offs contaminated by residential and agricultural developments in the area. During dry periods, it will maintain a desirable minimum flow of fresh water to the estuary, reducing extreme salinity changes.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA