Responsive Image Banner

Trump wall contract

Premium Content

08 November 2018

Border_USA_Mexico

Border fence between Tijuana, in Mexico, on the right and the border patrol offices of San Diego, US, on the left

A US$145 million contract to build a section of President Trump’s US-Mexico border wall has been awarded to Texas firm SLS.

The contract, referred to as RGV-03, for the 9.6km stretch in the Rio Grande Valley area in the US state of Texas was awarded by the US Customs and Border Protection (CBP), in partnership with the US Army Corps of Engineers (USACE).

The project includes the construction and installation of a reinforced concrete levee wall to the height of the existing levee, with 5m-tall bollards installed on top, and vegetation removal along a 45m enforcement zone along the length of the wall.

The enforcement zone will also include detection technology, lighting, video surveillance and an all-weather patrol road running parallel to the levee wall.

Construction is scheduled to begin in February 2019.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now