Skanska to design/build Washington tunnel

29 October 2013

A joint venture led by Skanska USA has been awarded a US$ 158 million contract to design and build a tunnel in Washington DC, US.

Skanska will develop the District of Columbia Water and Sewer Authorities’ Clean Rivers First Street Tunnel with local contractor JayDee.

The project includes floodwater protection in the communities of Bloomingdale and Le Droit along with the design and construction of tunnels and shafts.

Work is scheduled to start this month and completion is expected in the second quarter of 2016.

The total contract value is US$ 158 million. Skanska’s share of 60% is worth US$ 94 million, which will be included in the order bookings for Skanska USA Civil in the fourth quarter 2013.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA