Responsive Image Banner

Skanska begins preconstruction work on New York SPARC Project

Contractor to provide deconstruction services for the Science Park and Research Campus Kips Bay (SPARC Kips Bay) project.

New York New York is one of the top ten most expensive cities in the world in which to build

Skanska has signed a contract with the New York City Economic Development Corporation (NYCEDC) to provide preconstruction and deconstruction services for the Science Park and Research Campus Kips Bay (SPARC Kips Bay) project in New York City.

The contract, valued at US$59 million (approximately SEK650 million), is included in Skanska’s US order bookings for the first quarter of 2025.

As part of the agreement, Skanska will undertake preconstruction services and the deconstruction of existing buildings on the CUNY Hunter College Brookdale campus, where phase one of the SPARC project is set to take place.

According to Skanska, the first phase will involve the creation of over 55,700 sq m (600,000 sq ft) of educational facilities for the City University of New York (CUNY) and New York City Public Schools (NYCPS). The plans also include the development of a central public open space, known as SPARC Square, and the construction of an ADA-compliant pedestrian bridge on 25th Street, spanning the FDR Drive.

Preconstruction work began in late 2024, with groundbreaking for the project expected by the end of 2025. Deconstruction of existing campus buildings is scheduled for completion in the first quarter of 2027.

This project adds to Skanska’s portfolio of significant infrastructure and development projects in the United States. Recently, Skanska has been involved in several major projects, including:

South Brooklyn Marine Terminal Upgrade - In April 2024, Skanska signed a final award worth $612 million to upgrade the South Brooklyn Marine Terminal in Brooklyn, New York. The project involves demolishing existing buildings, dredging berths, upgrading bulkheads, and installing new wharf and dock facilities to support offshore wind farm projects.

Skanska signs $612m final award for South Brooklyn Marine Terminal upgrade Skanska has signed a final award worth $612 million for the upgrade of the South Brooklyn Marine Terminal in Brooklyn, New York, USA.

Portage Bay Bridge Replacement - In April 2024, Skanska secured a $1.4 billion deal with the Washington State Department of Transportation to replace the aging Portage Bay Bridge in Seattle. The project aims to construct a seismically resilient structure to improve safety and infrastructure longevity. 

Skanska in $1.4 billion deal to replace vulnerable Seattle bridge Skanska has won a deal for US$1.4 billion with the Washington State Department of Transportation (WSDOT) to replace the Portage Bay Bridge in Seattle, Washington.

MetLife Stadium Renovations - In February 2024, Skanska began renovations on the MetLife Stadium in East Rutherford, New Jersey, in preparation for the FIFA World Cup 2026. The project includes demolishing sections of pre-existing seating and installing a new modular steel composite seating system to meet FIFA requirements. 

Skanska begins work on project for FIFA World Cup 2026 The project involves the demolition of four corners of pre-existing precast seating throughout the stadium

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time