Responsive Image Banner

Preferred bidders named for Scotland’s Forth Bridge

Premium Content

28 March 2011

An artists impression of the new Forth Road Bridge (right)

An artists impression of the new Forth Road Bridge (right)

The Scottish government has shortlisted a joint venture consisting of Hochtief, Morrison Construction, Dragados and American Bridge International to win the £ 790 million (€ 897 million) contract to design and construct a cable-stayed road bridge over the Firth of Forth in Scotland.

The Forth Crossing Bridge Constructors (FCBC) joint venture is the preferred bid to construct a new bridge to the west of the existing Forth Road Bridge together with new road connections both north and south of the estuary.

The new crossing will consist of a dual two-lane carriageway with hard shoulders and will replace the existing Forth Road Bridge as the main route for traffic across the Forth. The existing bridge is set to be retained as a public transport corridor for buses, cycles and taxis.

Transport Scotland said FCBC's proposal for the project represented a significant saving on the initial estimated cost range of £ 0,9 billion to £ 1,2 billion (€ 1 billion to € 1,4 billion). It said it expected to award the contract formally to FCBC in April, with construction starting on site "soon after".

The government body described the new Forth Bridge as "the biggest Scottish infrastructure project for a generation".

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now