Palm Jumeirah's Gateway Bridge 80% complete

08 May 2008

Less than one year after construction began, the 10-lane Gateway Bridge to the Palm Jumeirah, Dubai is more than 80% complete.

Scheduled for completion in November 2005, the design comprises two five-lane bridges, one in each direction.

Each is 360 m long by 26 m wide, and will link directly to Sheikh Zayed Road from the Soufah Interchange, which is also under construction.

The design concept was created by H2L2 Architects/Planners.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA