Responsive Image Banner

North Macedonia’s PV plant to start construction soon

Premium Content

North Macedonia’s Prime Minister Dimitar Kovacevski is reported to have said that the construction of a 100 MW photovoltaic power plant in Oslomej, a PPP project of the state-run power producer ESM, is expected to start construction soon.

Kovachevski in the Assembly of the RSM (Photo: MIA)

Kovacevski said that he expects ESM to launch the construction of another 10 MW solar power plant in Oslomej in 2023.

The country has significant plans to focus on renewable energy projects as part of its wider energy transition. 

The Prime Minister is also said to have pointed out, other projects for the construction of photovoltaic power plants in REC Bitola, with a capacity of between 200 and 300 MW, are being finalised, and in the next two years all 130 MW of photovoltaic power plants should be put into use.

The first large-scale solar plant in North Macedonia, a 10 MW solar plant Oslomej 1 owned by ESM, was reported to be connected to the power grid in April 2022.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey