London 2012: Stadium design unveiled

27 February 2008

The design for the main stadium for the 2012 London Olympic Games has been unveiled.

Following the games, the 80000 capacity venue will have 55000 seats removed, converting it to a smaller permanent sports facility.

The central 'bowl' of the stadium will be sunk below ground level to bring spectators close to the action.

A 28 m-span, cable supported roof will cover two thirds of the seated area, while a fabric curtain will wrap around the structure providing additional protection and shelter.

The stadium will be built by the Team McAlpine consortium, which is led by contractor Sir Robert McAlpine, and includes HOK Sport, Buro Happold, HED and Savills Hepher Dixon.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA