Responsive Image Banner

Italy to set aside €12bn for world’s longest suspension bridge

Premium Content

Messina Strait, Italy Messina Strait, Italy (Photo: AdobeStock)

Italy’s government is to set aside 12 billion euros (US$12.7 billion) to build what would be the world’s longest suspension bridge across the Strait of Messina in Sicily.

The bridge has been in the planning stages for decades, but the company created to oversee its construction was shut down in 2013 as part of a drive to cut expenses as Italy struggled to rein in rising public debt during a long economic recession.

Last month, a consortium led by Italian group Webuild said it had delivered a revamped version of the project, updated according to the most recent technological developments and technical regulations.

The bridge connecting Sicily to the southern Calabria region would be some 5 km (3.11 miles) long and include a central span measuring 3.3 km - easily beating the current record 2.02 km central span on the Canakkale Bridge in Turkey.

Supporters of the project believe a fast rail and road connection would boost the underdeveloped economy of southern Italy.

They also say it would enable cargo ships from the Suez Canal to off-load in Sicily, from where trains would transport the goods to the north, reducing the need for costly voyages across the Mediterranean Sea.

At present cars, trucks and trains have to cross the strait that divides Messina and the toe of Italy by ferry, a journey which takes around 20 minutes from departure to docking.

But there is also opposition to the bridge, with those against the proposed project questioning the wisdom of building in earthquake zone as well as highlighting the potential harmful effects on the landscape and ecosystem, as well as the high cost.

Presenting the government’s 2024 budget, Italy’s economy minister Giancarlo Giorgetti said the €12 billion would be invested over a number of years with the first three instalments paid by 2026.

Infrastructure minister Matteo Salvini has made the bridge a priority in the government’s agenda and has previously stated that he wants construction to start in the summer of 2024.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now