Responsive Image Banner

Italian hospital 'must follow Genoa bridge example'

Premium Content

15 October 2020

An impression of the under-construction hospital in Taranto, Italy

An impression of the under-construction hospital in Taranto, Italy

At a groundbreaking ceremony for a new 715-bed hospital in Taranto in southern Italy, the country’s Prime Minister, Giuseppe Conte, said the contractors on the project “must hurry”.

He said, “It’s like the Genoa bridge. We are here to support you. We have to make it in time. It doesn’t exist that in Italy it takes two years, three years, four years, five years for a work.”

In his speech, Conte was referring to the San Giorgio bridge that replaced the Morandi bridge in Genoa, which collapsed in August 2018.

The irreparably damaged bridge was dismantled, removed and replaced by the newly-designed structure in less than two years, with teams from a wide range of Italian contractors working together round the clock to achieve the record result.

The start of construction on the €162 million San Cataldo hospital project comes as Italy reports record numbers of positive tests for Covid-19, signalling a gathering of pace in the second wave of the pandemic.

The hospital structure will have an area of 226,297m2; It will consist of six main blocks and will host 70 clinics, 28 diagnostic rooms and 19 operating theatres.

The building will be erected on one foundation slab, measuring 310m x 240m, on which a central three-storey building will stand as a central axis, with four C-shaped blocks, each with four storeys, radiating from the central block.

The governor of Puglia, who joined the Prime Minister at the groundbreaking ceremony, responded to his call for rapid construction by saying, “We are in Puglia. We can do it.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now