Gothenburg bridge for Skanska

27 September 2016

Gothenburg, Sweden

Gothenburg, Sweden

Skanska, in a joint venture with MT Højgaard, has signed a contract with the City of Gothenburg Urban Transport Administration in Sweden to build a bridge over the river Göta älv – the Hisingsbron.

The value of the contract amounts to a total of SEK2.0 billion (€207.86 million), and Skanska’s share is 70%, worth about SEK1.4 billion (€145.68 million). This will be included in order bookings for Skanska Sweden for the third quarter 2016.

The project is a turnkey contract and the bridge is designed as a vertical-lift bridge of steel and concrete. In addition to the bridge, the project includes a facility for tram transportation, new roads and connections, installation, machines and control systems for the bridge, and also demolition of the old bridge.

MT Højgaard is responsible for steel works including mechanics.

The project will employ up to 250 people from Skanska. Construction is scheduled to start in January 2017, and the project is expected to be completed 2022.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA