Responsive Image Banner

GEDA lift helps in restoring 200-year-old church organ in Italy

Premium Content
Workers use a GEDA Lift 250 Perfect to disassemble a 202-year-old organ with 2,013 pipes at the Cathedral of Cologna Veneta in Verona, Italy. (Photo: GEDA GmbH)

During the restoration of a 200-year-old church organ in the Cathedral of Cologna Veneta in Verona, Italy, workers utilized a GEDA GmbH lift to dismantle 2,013 organ pipes and the delicate components of the historical instrument.

Italian equipment rental company CI.ERRE SRL provided a GEDA Lift 250 Perfect for the task because the 8-meter-high organ pipes in the church’s gallery were well within the lift’s maximum reach of 18.3 meters.

The lift, which can transport up to 250 kg at 30 meters per minute, is made of aluminum and designed to be disassembled quickly, transported in any van or truck and reassembled without tools.

That versatility was key, as workers could only access the organ  – “one of the largest and most complex musical instruments of the 19th century” and a “work of art,” according to the GEDA – through a narrow stairway just outside the cathedral’s high gallery.

The German construction equipment manufacturer said organ builder Pietro Corna, from Bergamo, Italy, was commissioned for the project.

The cathedral is dedicated to the Nativity of St. Mary and was built in the neoclassical style in 1821.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
Why is LiuGong Access betting on new telehandler range for growth?
Telehandlers have never truly taken hold in China - at least, not yet.
Inside Trimble: How the Caterpillar relationship is shaping grade control
After 23 years of collaboration, Trimble’s Chris Shephard explains how the Caterpillar joint venture is evolving to boost flexibility and innovation in grade control technology
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA