Responsive Image Banner

Former SNC-Lavalin exec sentenced to prison

Premium Content

13 January 2020

snclavalinlogo

SNC-Lavalin has settled its legal issues by paying a fine

Sami Bébawi, 73, former head of international construction for Canadian engineer SNC-Lavalin, was sentenced to eight years and six months in prison on January 10 for his part in corrupt practices in Libya during the regime of Moammar Gadhafi.

The company separately settled its own corruption charges related to when its subsidiary SNC-Lavalin Construction pleaded guilty in the Court of Quebec to a single charge of fraud on December 18, 2019.

All other charges against SNC-Lavalin Group and its international marketing arm, SNC-Lavalin International, have been withdrawn as part of the settlement, which sees SNC-Lavalin Construction paying a CAD$280 million (US$214 million) fine over five years.

A Quebec Superior Court jury found Bébawi guilty on December 15, 2019 of all five counts he faced, including fraud, corruption of foreign officials and laundering proceeds of crime. 

Canada’s Crown prosecution alleged that SNC-Lavalin transferred approximately CAD$113 million (US$86 million) to a shell company between the late 1990s and the end of the Gadhafi regime in 2011. The prosecution’s main witness, another former SNC-Lavalin executive, Riadh Ben Aissa, told jurors the money was used to reward Moammar Gadhafi’s son, Saadi, for giving the company construction projects in the period totalling at least CAD$1.85 billion (US$1.4 billion).

The charges against SNC-Lavalin, the company, were brought in 2015, and related to activities in Libya during the period of 2001 to 2011.

“We are pleased to settle these legacy issues and remove these legal uncertainties overhanging the company,” said SNC-Lavalin Group board chairman Kevin G. Lynch. “We feel this settlement is fair, and we deeply regret this past behaviour which was contrary to our values and ethical standards. The company has changed a great deal, embraced a world-class integrity regime and culture, and going forward we have renewed confidence about the company’s future.” 

SNC-Lavalin said it does not anticipate that the guilty plea will affect the eligibility of SNC-Lavalin Group companies to bid on future projects.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane manufacturer ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now