Final bids call for Mumbai bridge project

10 January 2017

The long-awaited Mumbai Trans Harbour Link (MTHL) project has reached final bidding stage, according to officials.

A total of 31 companies, including Larsen & Toubro and China Railway Construction Bridge Engineering Bureau Group, have been asked to submit proposals for the construction of what will be the longest sea bridge in India.

While the total length of the bridge project is 22 km, 16.5 km of the span will be over sea.

In 2004, when the first plans for the bridge were drawn up, the total estimated cost was set at Rs4,500 crore (US$660 million); the current estimate is for a total cost of around Rs17,750 crore (US$2.6 billion).

Approximately 80% of the project will receive its funding from Japan International Cooperation Agency, with the remainder coming from the Mumbai Metropolitan Region Development Authority (MMRDA).

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA