Responsive Image Banner

Expressions of interest for Mexico City airport

Premium Content

17 September 2015

Nuevo aeropuerto mexicano

Nuevo aeropuerto mexicano

The bidding process for the proposed new International Airport in Mexico City has opened. The Secretariat of Communications and Transportation (SCT) has invited expressions of interest in the first stage of construction, which involves clearance and earthworks over the 44.3 km2site.

According to the SCT, there will be 21 major contract packages on the US$ 9 billion project, which was unveiled by Mexican president Enrique Peña Nieto in September last year. It is designed to replace the existing airport, and is on a site some 10 km north in the Zona Federal del Lago de Texcoco.

It will comprise a single 560,000 m2 terminal and six runways – two will be 4.5 km long , with the other four 4 km long. There is an ambition to secure a high Leadership in Energy & Environmental Design (LEED) rating for the terminal, which will have a capacity of 120 million passengers per year.

Mexico City’s existing international airport was first opened in 1958, in what has since become a densely populated part of the city. Despite a series of expansions, including the opening of a second terminal in 2007, there are only two runways and capacity is limited to 40 million passengers per year.

Target completion for the new airport is October 2020.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time