Crossrail’s new £20 billion transport plans

03 November 2014

Crossrail portal under construction at North Woolwich has set the scene for developing a further sch

Crossrail portal under construction at North Woolwich has set the scene for developing a further scheme running north-south across London

Proposals have been put forward to create a further major UK £20 billion (€25 billion) upgrade to London’s central railway system, known as Crossrail 2.

The scheme, which would run north-south through the city, would build on the initial £15 billion €19 billion) Crossrail project that is being built between Heathrow in the West, through to Abbey Wood in the south east of the capital and expected to be completed in 2018.

According to London Mayor Boris Johnson, the new route compliments the present rail upgrade. He said that it was vital for London to “remain competitive” through such infrastructure development.

If approved by the Government, work on Crossrail 2 would begin in 2017 - making journey times across the heart of the city up to 20 minutes faster for commuters.

It would make use of existing stations including Euston, King’s Cross, Angel, Tottenham Court Road and Victoria, and be capable of carrying up to 90,000 people into central London at its planned peak operating capacity once opened in the early 2030’s.

There will be a series of public consultations throughout 2015 outlining the preferred routes for the new project.

See the December issue of Construction Europe for a Crossrail site report on the North Woolwich tunnel – the only point to cross the River Thames as part of Europe’s largest construction project.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA