Responsive Image Banner

Contractors shortlisted for US$814m bridge

Premium Content

11 March 2019

Howard Frankland Bridge - Index

The existing Howard Frankland Bridge connecting Tampa and St. Petersburg

Three design-build groups have been shortlisted by the Florida Department of Transportation (FDOT) for a US$814 million contract to carry out works on the Tampa bridge project in Florida, US.

The bridge will be built next to the existing Interstate 275 Howard Frankland Bridge which connects Tampa and St. Petersburg over Old Tampa Bay.

The existing bridge needs to be replaced as it is reaching the end of its serviceable life. It will be deconstructed once the new bridge has been completed.

The new bridge will include four general use lanes and a 3.66m shared use path.

Two Northbound express lanes will also be implemented to support future rail or bus transit.

On the FDOT shortlist are joint ventures from: Atlanta-based contractor Archer Western Construction and the Indiana-based civil group Traylor Bros; California-based Granite Construction Co. and Louisiana-based Boh Bros. Construction; and Nebraska-based Kiewit Infrastructure South and Kansas-City based Massman Construction Co.

Each of these teams must now submit a technical proposal by 12 August, followed by a price proposal to be submitted by 8 October.

The FDOT will select the winning team of contractors by 14 October and construction is expected to begin in late 2019 or early 2020.

The completion date for the project is set to be late 2024.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Liebherr LR 1300 comes of age and keeps on going
At 18 how does the 300 tonne capacity LR 1300 lattice boom crawler crane remain so popular?
Global construction equipment sales are still faltering. When will they recover?
Global construction equipment sales should start to come back from the bottom of the cycle next year, according to Off-Highway Research, but there is some uncertainty around the forecast 
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time