Responsive Image Banner

Construction workers killed in Colombia bridge collapse

Premium Content

16 January 2018

Colombia bridge

An artist’s impression of the finished bridge

A suspension bridge that was to shorten the travel distance between the Colombian capital Bogotá and Villavicencio has collapsed, resulting in the death of at least nine people. 

The unfinished bridge is part of a government plan to boost economic development in the center of the country. The development calls for construction of a new road, including seven tunnels totaling 11.9km, 20 viaducts and bridges totaling 2.4km, and five footbridges. The project is part of Colombia’s 4G highway concessions program.

The collapse of the Bogotá to Villavicencio highway sent columns of concrete and steel into the narrow Ríonegro gorge. The planned 614m bridge was just 20m from being completed, according to Colombia’s Minister of Transport, Germán Cardona.

The distance between Bogotá and Villavicencio is 86km, but given the difficult terrain, travel can take up to three hours.

According to an eyewitness reports, at least 21 construction workers were on the bridge at the time one of two 258m high towers collapsed.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now