Responsive Image Banner

Construction ‘as usual’ in UAE

Premium Content

24 March 2020

Dubai

The construction industry in the United Arab Emirates (UAE) is continuing as ‘usual’ despite the impact of Coronavirus, according to data and analytics company GlobalData.

As a result of the worldwide implementation of precautionary health measures to help stop the spread of the virus, the country’s trade, tourism and transport industries have all been affected by the global slowdown of these industries.

With these critical UAE industries struggling, the country’s central bank has introduced a AED100 billion Targeted Economic Support Scheme, that aims “to contain the repercussions of the pandemic COVID-19”.

The Central Bank of the UAE said the package includes AED50 billion (US$13.5 billion) of collateralised loans, which will be offered to all UAE banks at zero cost. It will also allows banks to boost their lending capacity by freeing up their regulatory capital buffers.

The package is intended to support banks and businesses during the Coronavirus crisis for up to six months.

GlobalData said it expects the package to benefit the local construction sector, which includes small and medium-sized enterprises in the design, contracting and fit-out industries.

Colin Foreman, deputy editor at GlobalData, said, “So far, UAE authorities have managed to implement social activity suspensions without severely affecting economic output.”

He added, “It is not yet clear when the spread of COVID-19 will peak in the Middle East. This will largely determine the guidelines for social movement that health authorities implement over the next few weeks. For now, however, it is construction as usual in the UAE.”

In addition to the central bank’s stimulus package, the UAE Cabinet has also approved a further AED16 billion stimulus package. This is part of measures initiated by the country’s Federal Government, which aim to ensure businesses continuity and “mitigate the coronavirus impact”.

His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President, Prime Minister and Ruler of Dubai, said, “We have adopted new systems in the banking, economic, and public sectors and provided a healthy infrastructure to deal with the worst possibilities. We have a national team that works around the clock.”

He added, “Coronavirus is a health virus, an economic virus, and a political virus too… and we say to all the countries of the world: It is the time for unity, cooperation and solidarity to fight the worst enemy of humankind. All differences diminish in the face of this challenge and the world can overcome it faster if the strong stood with the weak and the rich with the poor.”

 

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now