Compact Brno

18 November 2008

The Brno motorsport track in the Czech Republic recently underwent comprehensive resurfacing work.

Contractor Kirchhoff GmbH and Co turned immediately to its fleet of BW174 Bomag asphalt rollers equipped with state-of-the-art measuring and control systems (asphalt manager) to ensure a speedy and accurate finish to a job that featured tolerances of just 3 mm and volumes of up to 3000 tonnes of laid material each day.

“We had to install a complete race track of 5,4 km in length and between 15,2 m and 17,2 m wide in just eight days,” said Hans-Joachim Bauer, site manager at Kirchhoff. “To create the 60 mm base took four days and then we had another four days in which to lay the 40 mm surface asphalt. “

Surface compaction control across the fleet was achieved through Bomag’s rapid control circuit to ensure that the fleet of compactors created the necessary finish over 4 passes.
STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA