Responsive Image Banner

Clamshell excavators excel on London Crossrail

Premium Content

24 August 2012

One of the two Hitachi ZX350LC units working at the new Bond Street Crossrail Station in London. The

One of the two Hitachi ZX350LC units working at the new Bond Street Crossrail Station in London. The machines were rented to Costain Skanska Joint Venture (CSJV) by M O’Brien Plant Hire.

Two Hitachi excavators with clamshell telescopic arms have helped contractors meet deadlines on the massive London Crossrail project in the UK.

The ZX350LC-3 and ZX350LC-5 units, both rented from M O'Brien Plant Hire, were used by Costain Skanska Joint Venture (CSJV) for excavation duties on two shafts to a depth five storeys below ground for the new Crossrail station at Bond Street.

CSJV conducted a test to compare the performance of the clamshell telescopic excavators against the traditional method of skips and a crane. Costain works manager Martyn Redsell said; "The ZX350LC-3 excavator was three times quicker than using an eight-cubic-metre skip. The skips removed 13 cubic metres per hour compared to 39 cubic metres per hour removed by the Hitachi. By mid-May, we were four days ahead of schedule."

Between March and June this year, the ZX350LC-3 - using a 25 m arm and 1.2 cubic metre bucket - worked 24-hour shifts, seven days a week, removing material from the first shaft.

The ZX350LC-5, the first of its kind in Europe, arrived in July 2012 to start work on the site's second shaft before moving onto another Crossrail site to carry out similar duties.

The shafts will be used to allow access for the tunnel boring machines which will arrive later this year.

Michael O'Brien, owner of M O'Brien Plant Hire, based in St Albans, Hertfordshire, said the machines offered major advantages; "The benefits include increased safety and flexibility in terms of where we can work. They give our company greater versatility; we can reach more customers with these machines."

The two units were sold to the rental company by Hitachi's UK dealer, HM Plant.

Crossrail, which is understood to be the largest ongoing civil engineering project in Europe, comprises the construction of a new railway across London connecting 37 stations, including Heathrow Airport in the west and Canary Wharf in the east.

Last year Speedy Hire said Crossrail would generate more rental revenues than the London 2012 Olympics project.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now