Responsive Image Banner

Chinese hospitals near completion in a week

Premium Content

30 January 2020

China hospital

Footage released by Chinese state media People’s Daily shows the progress of the construction

In response to the outbreak of the coronavirus virus China is building two hospitals in Wuhan – where the majority of those with the virus are located – in a matter of weeks.

Groundbreaking for the first hospital, which will have approximately 1,000 beds, occurred on January 24 and it is scheduled to be operational by February 3. The second hospital, which will have 1,300 beds, is expected to be open days later.

Footage of the construction taken by drones is being shown on Chinese television so that the progress of the construction can be viewed.

The hospitals are being built using prefabricated units, which is one of the reasons they can be built so quickly. Wuhan officials are reported to be using blueprints from a hospital that was built on the outskirts of Beijing in around seven days during the SARS crisis in 2003.

Wuhan is in the central province of Hubei, which has a population of around 60 million – the majority of the confirmed cases are in the province. Despite Wuhan city being effectively placed into quarantine the virus has spread across China and to some other countries.

According to the BBC, the death toll for the virus has risen to 170 and there are 7,111 confirmed cases in China.

 

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
Why is LiuGong Access betting on new telehandler range for growth?
Telehandlers have never truly taken hold in China - at least, not yet.
Inside Trimble: How the Caterpillar relationship is shaping grade control
After 23 years of collaboration, Trimble’s Chris Shephard explains how the Caterpillar joint venture is evolving to boost flexibility and innovation in grade control technology
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA