Responsive Image Banner

Burj Dubai record, rival announced

Premium Content

11 April 2008

Dubai-based developer Emaar Properties' Burj Dubai has reached 629 m, making it the world's tallest man-made structure, the developer announced on Monday.

The 160-storey tower, which is already the world's tallest building and tallest free-standing structure, has now surpassed the 628.8 m high KVLY television (TV) mast in North Dakota, US.

The KVLY-TV mast had held the title of world's tallest supported structure since 1963.

Commenting on the record braking achievement, Emaar's chairman Mohamed Ali Alabbar said, "With over 160 storeys now, the most number of liveable floors in any building in the world, Burj Dubai is already pushing the frontiers in architecture, construction and engineering excellence."

The Burj Dubai will eventually be the tallest structure in the world in all four of the criteria listed by the Council on Tall Buildings and Urban Habitat (CTBUH), according to Emaar.

The CTBUH measures the final height to the structural top, the highest occupied floor, to the top of the roof, and to the tip of the spire, pinnacle, antenna, mast or flag pole, provided they consider this to be an integral part of the overall design.

The final height of the Burj Dubai is currently rumoured to be over 900 m. However, local media said late last year the final height would be 818 m, citing architects drawings posted on the internet.

However, Emaar's triumph may not last long. Rival Dubai developer Nakheel has just announced plans to build a 1200 m high tower on the US$ 61 billion Arabian Canal development.

According to local news agency Arabian News, the project will be designed by Australian architects Woods Bagot.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
CICA president: Why better permitting, collaboration, and financing are key to solving global construction’s biggest issues
Regardless of where they are based, there are certain challenges that are common to construction companies all over the world
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Discover what 138 construction professionals say about the future of earthmoving.

FREE REPORT

Essential reading for contractors planning their next phase of technology adoption.

Download for free