Brisbane's new Gateway Bridge progressing

19 March 2010

Construction of the New Gateway Bridge, Brisbane, Australia is progressing with the Leighton Abigrou

Construction of the New Gateway Bridge, Brisbane, Australia is progressing with the Leighton Abigroup Joint Venture currently working on pavement and drainage in the old toll plaza area.

Construction of the new Gateway Bridge, Brisbane is progressing with the Leighton Abigroup Joint Venture currently working on pavements and drainage in the old toll plaza area.

The bridge is part of the AU$ 1.88 billion (US$ 1.45 billion) Gateway Upgrade Project.

The second Gateway Bridge will open to southbound traffic in mid-2010, followed by refurbishment of the existing Bridge under partial lane closures.

Both bridges will be fully opened to traffic by early 2011, with six lanes for southbound traffic and six lanes for northbound traffic.

The project is being delivered by Queensland Motorways with design and construction by the Leighton Abigroup Joint Venture.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA