Responsive Image Banner

Bidders shortlisted for US$2.5 billion bridge

Premium Content

The Government of Lagos State, Nigeria, has announced the final shortlist of bidders for the Fourth Mainland Bridge project.

The Third mainland bridge in Lagos, Nigeria. The Third Mainland Bridge in Lagos, Nigeria. (Photo: AdobeStock)

A consortium consisting of Portuguese contractor Mota-Engil, China Communications (CCCC) and China Road and Bridge, a subsidiary of CCCC, is in the running for the US$2.5 billion public-private partnership project.

A joint venture between China Gezhouba Group Company and China Geo-Engineering Corporation is also shortlisted, while a consortium led by China Civil Engineering Construction Corporation also makes the list.

The successful bidder will be responsible for the construction of a green field tolled road and bridge, three toll plazas, nine interchanges, a 4.5km lagoon bridge and an eco-friendly environment.

Ope George, director general of Lagos State Government Public Private Partnership Office, said the construction of the bridge, which will be the second longest in Africa once finished, aims to reduce “severe congestion” on the existing Third Mainland Bridge, which was built in 1990.

Construction of the 37km structure, which will run between Lagos Island and Lagos city, was expected to begin in 2021. However, delays have hit the project, and issues surrounding the best place to build it held up the bidding process.

Lagos State also previously said that more consideration and transparency was needed due to public-private partnership funding, which in turn caused longer delays to construction.

The State says that it expects to announce its preferred bidder by the end of 2022, having reduced the list down from over 50 bidders since 2019.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
US Faster Labor Contracts Act draws union support, pushback from contractor group
A developing regulation in the US is receiving mixed reviews from the construction industry
Conexpo 2026: show director on what’s new and what’s next
Dana Wuesthoff reveals to Andy Brown the highlights of ConExpo 2026 and how planning for 2029 is already well underway
What machine sales tell us about the state of European construction
There are signs of a recovery – albeit a fragile one – in the European construction market
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA