Responsive Image Banner

Analyst: Cracks widening in Dubai’s construction market

Premium Content

Government spending cuts resulting from the coronavirus pandemic are delaying construction projects in Dubai and some say the move could further compromise an already stressed industry in this traditionally prosperous region.

Dubai

The Dubai Creek Harbour Tower would be the tallest building in the world when completed

According to a report in Bloomberg, Dubai’s government is freezing all hiring and cutting administrative spending by at least 20% across all departments as the coronavirus pandemic stymies state revenue.

Bloomberg reported that a letter sent by Director General Abdulrahman Al Saleh to all state departments during the week of 6 April said the emirate’s department of finance had ordered a 50% reduction in capital spending and a delay to new government construction projects.

The crisis caused by the coronavirus has shut down much of this middle east transport and business hub which is heavily dependent on tourism, trade and retail. Meanwhile, lower oil prices are adding to the economic challenges in the region.

According to a Reuters report, local development giant Emaar Properties has suspended work on projects in Downtown Dubai, Dubai South and Dubai Creek Harbour, including the Dubai Creek Harbour Tower, billed as being higher than Dubai’s 823-metre Burj Khalifa, which is currently the world’s tallest building.

According to data and analytics company GlobalData, the Dubai government’s decision to rein in spending, while arguably a necessary step, will deepen the cracks in the local construction sector, which has been operating in a low-margin and high-risk environment for several years.

Neha Bhatia, construction and infrastructure editor at GlobalData, commented, “A large number of projects in Dubai, as well as the wider Middle East, typically exceed the original awarded contract value for reasons such as design changes and contractual disputes. With a zero-tolerance approach to cost overruns, local contractors now face the prospect of making a loss on their ongoing projects.

“While construction is one of the sectors exempted from the emirate’s 24-hour restrictions on outdoor movement, contractors are concerned that onsite works will slow down as the pandemic continues to spread regionally. Precautionary measures such as those imposed on worker transportation are already reducing onsite productivity.”

The coronavirus pandemic has accelerated the downward trends that were expected in Dubai’s post-Expo 2020 real estate market. In a related move, Dubai has proposed a one-year delay to Expo, a major event it was due to host in October.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
Rethinking construction’s most overlooked role: the superintendent
With labour shortages worsening, it’s time the industry modernised how it presents one of its most vital jobs – the on-site leader who keeps projects moving
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
World Construction Week newsletter

World Construction Week & Construction Briefing

Global project news, expert analysis and market trends, straight to your inbox.

Sign me up