Aktor signs contract for Romanian road

28 November 2014

Aktor, the construction subsidiary of Greek group Ellaktor has signed the contract for the construction of Lot 2 of the motorway from Sebes to Turda in Romania.

The contract, through Aktor-Euroconstruct Trading ’98 in which Aktor holds 51%, is being financed by the European Commission Cohesion Fund (85%) and the Romanian State (15%), through the Commission’s Sectoral Operational Programme – Transport.

The contract is worth RON549 million (€122 million).

The motorway will be 24.25km long, with two traffic lanes and one emergency lane in each direction. There will be a maintenance and monitoring centre, plus one interchange, 12 viaducts, nine overpasses and seven underpasses.

The length of the project duration is 22 months with completion due in September 2016.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK – Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA