Responsive Image Banner

Aecom, Clark attached to US$200m White House ballroom build

The US White House is set to begin construction in September 2025 on a new US$200 million State Ballroom, with Clark Construction named as lead contractor and Aecom heading engineering services.

A render of the new White House ballroom, which is set for a construction start in September. Image: White House A render of the new White House ballroom, which is set for a construction start in September. Image: White House

The project will add a 90,000 sq ft event space to the presidential complex, increasing the White House’s seated event capacity from 200 to 650. The ballroom is expected to eliminate the need for large outdoor tents currently used for major events, which are typically erected over 100 yards from the main entrance.

The administration said the addition will allow future presidents to host visiting heads of state and ceremonial events in a secure, permanent space without disrupting the White House’s historic appearance.

McCrery Architects, based in Washington, D.C., will lead the design, which is intended to reflect the classical architecture of the current Executive Residence.

The ballroom will be built on the site of the current East Wing, portions of which will be renovated and demolished. Originally constructed in 1902 and later modified during World War II, the East Wing currently houses offices for the First Lady and White House social staff, which will be temporarily relocated during construction.

Funding for the project is said to come entirely from private donations, including contributions from President Donald Trump.

The ballroom will be the largest structural addition to the White House in more than 75 years and will nearly double the floor area of the 55,000 sq ft Executive Residence.

Construction is expected to finish before the end of Trump’s term in early 2029.

Trump officially pulls $4bn in funding for California High Speed Rail California High Speed’s CEO calls cancellation of funding ‘wrong’ and ‘illegal’
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time