Responsive Image Banner

New York City’s US$1.45bn coastal resiliency project finishes first phase

Premium Content

In mid-October, New York City officials gathered to celebrate the completion of phase one of a nearly US$1.5-billion project called the East Side Coastal Resiliency (ESCR) project, which includes utility and infrastructure improvements to waterfront areas and five public parks on the city’s East Side.

East Side Coastal Resiliency project in New York (Image courtesy East Side Coastal Resiliency project) Crews work a site on the East Side Coastal Resiliency project in New York City, US. (Image courtesy East Side Coastal Resiliency project)

Aimed at reducing flood risk due to coastal storms and sea-level rise on Manhattan’s East Side from East 25th Street to Montgomery Street, the project is running through two phases (a northern and southern segment), with phase one completed at an estimated cost of around $165 million.

Work throughout the coastal project area includes installation of flood barriers – including a 2.4 mile (3.8km) long barrier from Montgomery Street to Asser Levy Playground – floodwalls and gates, retrofits for sewer outfall and various park improvements at public spaces along the corridor.

The first floodgate – which weighs about 16 tons and is more than 40-ft long – was installed in early 2022.

“The boundaries of this project correspond with the natural ‘pinch-points’ in the 100-year floodplain,” said the city’s project webpage.

“The project design integrates flood protection into the community fabric, improving waterfront open spaces and access, rather than walling off the neighbourhood.”

It’s estimated the build will better protect more than 110,000 New York residents from future storm events.

Leading the management and construction of the scheme is HNTB/LiRo Joint Venture. HNTB is a Missouri-based infrastructure design and construction firm and LiRo is a management services company based in New York.

The entire flood mitigation improvement system is expected operational at the end of 2026.

Contractor wins first contract on $2.3bn project to protect Staten Island from flooding Bronx firm has won $132 million contract to protect Staten Island from flooding
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Why construction needs to look forward if it wants to handle uncertainty
Dr Alan Manuel, group chief executive of Currie & Brown, on why the global consultant has launched a new Certainty Index
‘European Rental Week’ puts cost control and sustainability in spotlight
As the third European Rental Week gets underway, Construction Briefing talks to leaders in Europe’s equipment rental industry about the relevance of rental in today’s construction sector.
Inside Saudi Arabia’s construction surge: three key takeaways
From Diriyah to Qiddiya, Saudi Arabia is building on an unmatched scale as Vision 2030 reshapes the kingdom’s skyline
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Construction technology survey

Share your views and we’ll give to charity!

Take a quick survey on construction technology and we’ll donate US$3 to Habitat for Humanity for every response.

Take the Survey