Responsive Image Banner

‘World’s highest’ 3D printed structure built in Himalayas

A 3D printer has reportedly been used to construct a military bunker at 11,000 feet in the Himalayan mountain Range in Leh, India.

A 3D printer has reportedly been used to construct a military bunker at 11,000 feet in the Himalayan mountai A 3D printer has reportedly been used to construct a military bunker at 11,000 feet in the Himalayan mountain. Image: Adobe Stock

What is claimed to be the world’s highest on-site 3D printed structure has been created by Simpliforge Creations and IIT Hyderabad in collaboration with the Indian Army.

The structure was printed in 14 hours using Simpliforge’s robotic 3D printer, which was deployed and commissioned in under 24 hours.

Simpliforge’s CEO Dhruv Gandhi said, “Reduced oxygen levels impaired power efficiency and human performance. Low humidity and high UV radiation impacted material integrity – but our systems delivered a robust structure in just five days.”

Operating at high altitudes with thermal extremes required specially engineered concrete.

Hari Krishna Jeedipalli, MD of Simpliforge, said, “This Ladakh bunker is more than a defense milestone – it’s validation for extra-terrestrial applications. We see this as a stepping stone toward space construction on the Moon and Mars.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
The good, the bad and the undeniable truth about… project management software
To really get on board with the digital transformation of construction, you have to know what it means – and what it might look like
Skanska calls for EU procurement reform to drive climate action
A new report from Sweden-based contractor Skanska highlights the need for procurement reform
How visual data and AI are driving smarter jobsites
Julie Pistritto, VP of Sales, Sensera Systems, on how AI can help construction create smarter, and safter, jobsites 
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA