Responsive Image Banner

Thermal fault detection tech studied

Premium Content

25 June 2020

 

Thermal imaging

Thermal imaging could assist in early fault detection during the construction process

Researchers at the University of Plymouth in the UK are investigating the use of thermal imaging as a tool for early fault detection in built structures.

The project, known as DeViz (Defect Visualisation via Thermography), involves research teams working with construction supervisors at two UK-based projects, to assess the efficiency of the technology and whether construction companies could embed it into their working practices.

Dr Julie Goodhew, an environmental physicist at the university, said, “Quality defects in buildings are a significant risk to reducing the energy used for heating them.

“Defects detected at an early stage in the construction process are more time- and cost-effective to rectify. But identifying them with the naked eye can be very difficult, whether it is issues with insulation, moisture or ventilation, or even defects of design, workmanship and materials.”

Professor Steve Goodhew, of the School of Art, Design and Architecture, and project lead for DeViz at Plymouth, said, “If the UK is to hit its ambitious efficiency targets then we need to ensure that our buildings are performing to their maximum capabilities.”

The two-year €220,000 DeViz study is being funded by the Centre for Research into Energy Demand Solutions (CREDS) and also involves researchers from the Environmental Change Institute at the University of Oxford.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
CICA president: Why better permitting, collaboration, and financing are key to solving global construction’s biggest issues
Regardless of where they are based, there are certain challenges that are common to construction companies all over the world
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Discover what 138 construction professionals say about the future of earthmoving.

FREE REPORT

Essential reading for contractors planning their next phase of technology adoption.

Download for free