Responsive Image Banner

TENs projects oversubscribed

Premium Content

11 April 2008

Requests for funding of Trans European Network (TENs) transport projects between 2007 and 2013 came to more than double the budget available from the European Commission. The Commission said it has received 221 project proposals, requesting funds of € 11,5 billion, compared to its budget for the five- year period of € 5,1 billion.

In deciding which projects to recommend funding for, the Commission says priority was given to cross- border schemes. It says that 56% of its budget has been allocated to such projects.

It also says all the selected projects met its objectives for sustainable development. The Commission's proposal would see the maximum possible funding given to inland waterway projects, although these would represent only 11,5% of the budget. The share for rail projects meanwhile would be 74,2%.

Among the projects receiving significant support from the Commission are the high speed line between Lisbon and Madrid (Evora-Merida), the “Rail Baltica”, studies for the “Trieste – Diva a” link between Slovenia and Italy, the Fehmarn Belt Fixed Rail/Road link, the Brenner and Mont Cenis transalpine rail crossings, the Seine-Scheldt inland waterway link and development of the Danube River. Furthermore, the Commission has selected proposals in the field of European Rail Traffic Management system (ERTMS), Intelligent Transport System (ITS) and Air Traffic Management (ATM).

Jacques Barrot, vice-president of the Commission responsible for transport said, “The proposed decisions are a response to the key challenge of transport and TENs policies. They will generate high added value for the EU and enhance the sustainability of transport in Europe.”

The Commission's funding proposal will now be sent to the Member States and the European Parliament for debate. After the agreement of the TEN financing Committee, the European Parliament will exercise its scrutiny right. It is expected that the Commission will adopt its final project funding decisions at the beginning of 2008.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
CICA president: Why better permitting, collaboration, and financing are key to solving global construction’s biggest issues
Regardless of where they are based, there are certain challenges that are common to construction companies all over the world
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Discover what 138 construction professionals say about the future of earthmoving.

FREE REPORT

Essential reading for contractors planning their next phase of technology adoption.

Download for free