Responsive Image Banner

Profits rebound at Leighton

Premium Content

09 December 2012

Australia’s Leighton Holdings Limited has announced a net profit after tax for the nine months ended 30 September 2012 of AU$ 317 million (US$ 332 million), compared to a loss after tax of AU$ -325 million (US$ -340 million) at the same point in 2011.

The company posted total revenue of AU$ 169 billion (US$ 17.7 billion) for the first three quarters of 2012, an increase of +6% on 2011 figures for the same period, which came in at AU$ 15.84 billion (US$ 16.6 billion).

The Australian contractor’s results were further bolstered by a growth in backlog of +3%, taking it to AU$ 45.3 billion (US$ 47.5 billion), up from AU$ 43.9 billion (US$ 46 billion) of value of work in hand at the end of the third quarter in 2011.

Commenting on the results, CEO, Hamish Tyrwhitt said that the group was continuing to deliver solid operating results, make progress on legacy issues, and advance its strategy to “stabilise, rebase and grow” the business.

“In the three months to September 2012, we completed Airport Link and substantially advanced the Victorian Desalination Project with the granting of Preliminary Commercial Acceptance following commissioning of stream one. We [have] completed testing on stream two and we remain on target for hand-over by the end of this year,” he commented.

Mr Tyrwhitt went on to add that while conditions were challenging in the Middle East, the Habtoor Leighton Group was awarded a number of new projects, including construction of a People Mover System in Qatar and a medical centre in Saudi Arabia.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now