Responsive Image Banner

Leighton Asia wins A$283 million deal on Manila rail project

Premium Content

Digital render of a modern train running on a new line through city and green spaces Image: Alstom

Contractor Leighton Asia has won a deal to build a section of the North South Commuter Railway System to ease congestion around Manila in the Philippines.

The Leighton-First Balfour joint venture will construct Package S-03B for the project, which will be worth A$283 million (US$187.3 million) in revenue for Leighton Asia, part of the Cimic Group.

SCR CP S-03B is a section of the nearly 56km-long railway financed by the Asian Development Bank.

The joint venture’s works include civil engineering, tunnel and building works for approximately 6.1km of the railway with 4.7km of the underground railway and 1.4km of at-grade railway.

It also includes the construction of a station, tunnelling works to connect to the Metro Manila Subway Project Senate Station, and mechanical, electrical, façade and other ancillary works.

Construction is expected to start in the third or fourth quarter of 2023 and complete by 2029.

The full railway runs along the existing Philippine National Railway between metro Manila and Calamba, southern Luzon, comprising 19 stations.

CIMIC Group executive chairman Juan Santamaria said, “The project is part of the government’s larger strategic transportation network to boost economic and urban growth between metro Manila and southern Luzon. We have a proven history in the region and we are pleased to be selected to deliver a vital infrastructure project that will benefit the community for decades to come.”

Leighton Asia managing director Brad Davey said, “Leighton Asia has a strong track record and expertise in delivering world-class railway projects. Our portfolio includes the Express Rail Link West Kowloon Terminus Station in Hong Kong, the largest underground railway station in the world. We are honoured to deliver the SCRP CP S-03B package and are committed to leveraging our 26 years of local experience in the Philippines to provide a safe and quality asset for our client and community.”

Last year, Hyundai Engineering & Construction won a $1.2 billion deal to build 32km of track and three of nine stations on the railway.

In February this year, Spanish contractor Acciona won a €480 million (US$530 million) deal to build 7.9km of track on a viaduct in Manila and three stations – España, Santa Mesa and Paco.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
What is the Genie business worth and what type of buyer could it attract?
What could happen following Terex’s announcement that it will sell or spin off its Genie aerials business?
EU Pay Transparency Directive: what will it mean for international construction businesses?
With less than a year to go until the European Union’s (EU) Pay Transparency Directive takes effect, what does it mean for international construction businesses?
5 ways formwork and falsework are evolving
At first glance, formwork and falsework is a simple-enough concept, vital though it is for temporary works.
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Inside The Minds of Leaders:
Using Tech To Unearth Greater Profit

FREE WEBINAR ON-DEMAND

This session was hosted by KHL's Mitch Keller, with speakers from AEM, Landmark Construction and Trimble.

Download and watch in your own time