Responsive Image Banner

Implenia to build station and railway tunnel for Swedish transportation scheme

Premium Content
Implenia will build the 'Haga' station and a railway tunnel for the 'West Link' in Gothenberg, Sweden Implenia will build the ‘Haga’ station and a railway tunnel for the ‘West Link’ in Gothenberg, Sweden (Image courtesy of Implenia)

Swiss construction company Implenia is set to build a section of the “West Link” transportation scheme in Gothenberg, Sweden, including a railway tunnel and station.

Implenia said that the contract with Trafikverket, the Swedish government agency responsible for transport infrastructure, has been awarded on a partnership model and is worth more than CHF 100 million (US$111.7 million).

The “West Link” project connects Gothenburg’s local transport system to the other routes that run through the city. It involves the construction of three new stations to relieve the strain on the main station.

In addition to the railway tunnel, the parallel service and emergency tunnel as well as the ventilation and fire gas tunnels, Implenia is building the new “Haga” underground station, including platforms and three entrances.

“We are delighted to contribute to this significant improvement of the transport infrastructure in western Sweden. Implenia will use its many years of extensive experience to implement the project and build this important new transport infrastructure in a logistically challenging, very tight inner-city space,” says Christian Späth, head division civil engineering at Implenia. “We would like to thank Trafikverket for its continued confidence in Implenia as an expert in large, complex tunnelling and civil engineering projects.”

The project will start in autumn 2024 and is scheduled for completion in 2029.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
Why telematics could be the most important item in your toolkit
Maximise uptime, productivity and fuel efficiency and you’re halfway to ensuring business success. And there’s a digital tool that can help…
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now