Responsive Image Banner

Funding secured for $137m floating dock ship repair facility in Ghana

Premium Content

A consortium of development banks and pension schemes has agreed to offer US$94 million in debt funding towards a $137 million floating dock ship repair facility in Ghana.

Ships in dry dock at a facility in Africa. Image courtesy of Africa Development Bank

The project, called ‘Shiprite’ at Ghana’s western Takoradi port will house a new 13,500t lift-capacity floating drydock, 30,000 sq m of reclaimed land, a 200m jetty, a modern workshop, offices and heavy marine equipment.

Lenders including the African Development Bank, African Export-Import Bank, Eastern and Southern African Trade and Development Bank, and Petra Pension Schemes signed a deal to provide the funding to Prime Meridian Docks (PMD) Assetco Limited to build and operate the facility.

PMD is a Ghanaian ship repair company with Free Zones Service Enterprise status and a 25-year concession from the Ghana Ports and Harbours Authority.

Kanayo Awani, executive vice president, Intra-African Trade and Export Development Bank, Afreximbank, said, “The strategic location of this facility will provide shipowners whose vessels trade within the Gulf of Guinea with world-class repair and maintenance services.”

Michael Awori, chief executive of the Southern African Trade and Development Bank (TDB), said, “TDB is pleased to co-finance Project Shiprite, a ground-breaking project in West Africa which will enable considerable cost and time savings for shipowners in need of maintenance and repair solutions in proximity and in line with international standards, thereby enhancing the efficiency of their operations.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
CICA president: Why better permitting, collaboration, and financing are key to solving global construction’s biggest issues
Regardless of where they are based, there are certain challenges that are common to construction companies all over the world
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Discover what 138 construction professionals say about the future of earthmoving.

FREE REPORT

Essential reading for contractors planning their next phase of technology adoption.

Download for free