Responsive Image Banner

EIB funds Baltic wind farm development

Premium Content

14 January 2013

The European Investment Bank (EIB) is to provide €500 million in financing to support EnBW Baltic 2 - the largest offshore wind farm to be developed to date in the German Baltic Sea.

Being developed by EnBW Erneuerbare Energien, EnBW Baltic 2 will have 80 wind turbines spread over an area of 27km2, 32km north of the island of Rügen. The sea can be 44m deep in this area, so special foundation structures called jackets are required.

Set to become operational in 2014, EnBW Baltic 2 will have a capacity of 288MW and will achieve an annual output of 1.2 billion KW hours. The wind farm will provide power to around 340,000 households.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now