EIB funds Baltic wind farm development

Premium Content

14 January 2013

The European Investment Bank (EIB) is to provide €500 million in financing to support EnBW Baltic 2 - the largest offshore wind farm to be developed to date in the German Baltic Sea.

Being developed by EnBW Erneuerbare Energien, EnBW Baltic 2 will have 80 wind turbines spread over an area of 27km2, 32km north of the island of Rügen. The sea can be 44m deep in this area, so special foundation structures called jackets are required.

Set to become operational in 2014, EnBW Baltic 2 will have a capacity of 288MW and will achieve an annual output of 1.2 billion KW hours. The wind farm will provide power to around 340,000 households.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Opinion | Exercising the critical thinking muscle on OEM rankings
Even posts on LinkedIn are sometimes not true. How do you spot the red flags?
Why adaptability is essential for a long career in construction
Dr. Claire Handby explains why experienced construction professionals have the skills they need to adapt and thrive
Can trucking unlock hydrogen for construction equipment?
Can trucking create the scale, infrastructure and economics needed to bring hydrogen into mainstream construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson VP Sales – Construction Division Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA