Responsive Image Banner

Consortium of contractors win $800m deal to build first phase of Port of NEOM

Premium Content

Digital render of the Port of NEOM Digital render of the Port of NEOM (Image: NEOM)

A consortium of contractors has won a contract worth SAR 3 billion (US$800 million) to build the first phase of the Port of NEOM in Saudi Arabia.

NEOM is a special economic zone in the north west of Saudi Arabia, for which multiple ambitious construction projects are planned, including a 170km-long linear city called The Line.

Belgian contractor Besix and Boskalis have become the first European contractors to win a design and build lump sum contract with NEOM, to build the first phase of the region’s port. Work will involve dredging and construction of quay walls.

Besix will work with local partner Modern Building Leaders (MBL) to design and build more than 3km of quay walls.

Located on the Red Sea, near the Suez Canal, the port serves as the primary seaport for NEOM and is undergoing a transformation to become what its developers claim will be the “world’s most technologically advanced, efficient and sustainable port”.

The Besix-MBL joint venture covers approximately 50% of the scope of the contract.

Peter Lembrechts, general manager at Besix said, “This project marks the company’s exciting return to Saudi Arabia where we will utilize our extensive experience to build the vital infrastructure needed for this visionary port. We would like to thank NEOM and the selection committee for entrusting us with this project and look forward to working with all partners to make this vision a reality.”

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
Seven construction technology trends for 2026
Experts say mixed-fleet data, real-time intelligence and autonomous machines will reshape project planning and field execution
Electrifying change
Can there be a pain-free approach to powering the next generation of construction equipment?
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Electrifying change

NEW ARTICLE

Off-Highway Research highlights steady progress in electrification, with market penetration at 0.8% and forecast to more than triple to over 3% by 2028. Nate Keller of Moog shares how hybrid innovation could accelerate this shift in the decade ahead.

Read now